Quality standards

Certifications,inspection,and records.

Certified sites, inspection steps, and release records used in supplier qualification.

  • AS9100
  • NADCAP
  • ISO 9001
  • IATF 16949
  • ISO 14001
  • ISO 45001
Allied & accountableOne contract

Built in an allied jurisdiction.

F4GE runs on an established precision base in an allied jurisdiction. Demanding programs get scale without export-control friction, under one accountable contract.

  • [01]

    Allied jurisdiction

    Production in an allied trade jurisdiction with the United States.

  • [02]

    Export Control Policy

    As everything becomes dual-use goods and technologies, F4GE is fully committed to complying with all applicable export control, sanctions, and anti-boycott laws.

  • [03]

    One accountable contract

    AS9100, IATF 16949, NDT, and MIL-STD records assembled by F4GE. One supplier, first article to serial.

  • [04]

    Supplier Code of Conduct

    We adopted this Supplier Code of Conduct to build a safe, ethical, and sustainable supply chain together with our suppliers.

    EN (PDF) KO (PDF)

Quality basisReviewed in supplier qualification

Certified sites and approvals.

These certifications and approvals are commonly reviewed during supplier qualification.

  • AS9100

    Aerospace quality management within the qualified production base.

  • NADCAP

    Special processes (heat treatment, NDT, surface treatment) to NADCAP accreditation.

  • ISO 9001

    Quality management systems maintained across production sites.

  • ISO 14001

    Environmental management across certified facilities.

  • ISO 45001

    Occupational health and safety management systems.

  • IATF 16949

    Automotive-grade quality for precision components.

  • CMMI L3

    Assessed process maturity across engineering and software.

  • Class societies

    LR, DNV, BV, ABS, KR and more for marine and offshore programs.

A measuring probe checking a part on an inspection fixture
Quality control and recordsTied to release

Inspection and release records.

Inspection records stay tied to final release and shipment.

  • [01]

    Incoming / in-process / final

    Inspection runs at incoming, in-process, and final stages across the production path.

  • [02]

    Dimensional and material verification

    CMM and spectrometer checks are used where dimensional or material confirmation is required.

  • [03]

    NDT where required

    UT, PT, and MT are applied when the part or program calls for them.

Cell OS · F4RIFY

Quality records

Production and inspection records are composed from machine data and prepared for buyer review and release.

Cell OS captures the part-level record and F4RIFY structures traceability and release documentation, delivered into your quality system.

Through to delivery

Traceability and release

Records remain tied to post-processing, shipment release, and final delivery documentation.

Get startedWe reply with a quote

What are you building?

Send a drawing for a part you're already sourcing. We return a quote on the same spec and the same certifications.

BUILD WITH US